Snooker Referees516 viewsPetchkasem Hotelyorky
|
|

Six years later, repainted381 viewsWindows replaced with aluminium and garden re-landscaped.yorky
|
|

Snooker Referee381 viewsPetchkasem Hotel. Isaan girls hate their dark coloured skin. Myself, I think it's gorgeous.yorky
|
|

The green field site273 views1 Rai (1,600 sq.m.) of land raised and ready for building.yorky
|
|

Wall paper and furnishings in the lounge258 viewsyorky
|
|

The kitchen242 viewsyorky
|
|

Column footing excavation234 views1.00 m x 1.00 m excavations down to solid.yorky
|
|

Setting out232 viewsThe sight rails.yorky
|
|

Concrete footings230 views"Hand balling" the concrete for the footings. We used 'ready-mix' for these pours.yorky
|
|

Bathroom221 viewsBoth bathrooms are tiled floor to ceiling for ease of cleaning. Also the bathrooms are 'dry', i.e. the shower at the end remote from the door behind a protective wall.yorky
|
|

Virtually complete214 viewsJust a lick of paint on the gutters and downpipes required.yorky
|
|

Digging the column footings198 viewsyorky
|
|

Concreting the column foundations196 viewsColumns - 6 No 12 mm rebar tied at 200 mm centres with 6 mm bar.yorky
|
|

Column foundation reinforcement182 viewsFoundation steel - 12 mm rebar mesh at 150 mm centresyorky
|
|

The perimeter wall and front gate173 viewsyorky
|
|